[Case Study] Lift-Up Method
A construction method that raises the height without demolishing the building. The building remains as it is while the roof height is increased.
We would like to introduce a case where Denki Kogyo Co., Ltd. adopted the "Lift-Up Method." Due to the aging of the existing traveling crane, we received a request to increase the crane's lifting height. In the construction process, we connected the columns of the raised portion to the existing column heads to enhance strength, and then, using the cover build method, we installed a new roof and walls before dismantling the existing roof from the inside. As a result of this construction, the crane's lifting height was increased, allowing for more flexible crane operation, which improved work efficiency. [Case Study] ■ Challenge: Increase crane lifting height ■ Result: The crane's lifting height was increased, allowing for more flexible crane operation, which improved work efficiency. *For more details, please refer to the PDF document or feel free to contact us.
- 企業:ヨシザワ建築構造設計
- 価格:Other